E-mail : service@ronsteel.comPhone : +8617773160488

News

Our products conform to GB, AISI, ASTM, DIN, EN, JIS standard for stainlesss steel coil, sheet and plate.

Ronsco, Stainless Steel Plate Stockist, 1.4436 Stainless Steel Plate
BackYou are in :  Home  >  News  >  Company News

Ronsco Supplied More Than 450 Tons Of 1.4436 Stainless Steel Materials For The Hong Kong Tseung Kwan O Bridge

Date:2022-04-13View:2051Tags:Ronsco, Stainless Steel Plate Stockist, 1.4436 Stainless Steel Plate

The Tseung Kwan O bridge is a project across the Tseung Kwan O Bay in Hong Kong. It is divided into three parts: the main bridge, the east approach bridge and the west approach bridge. The main bridge is composed of steel box girder and steel arch, and all approach bridges are steel box girders. The main span is an outward inclined butterfly steel arch bridge with a length of 214 meters, and 100m side span steel box girders are arranged on both sides. The steel arch of the project is made of S690L, and the steel box girder is made of S420M high-strength steel. The overall transportation weight of the main bridge is about 11000 tons.


The bridge connects the road across the bay, with a total length of about 1.8km. Among them, 1km is an offshore viaduct, and the deck width of the main bridge is about 35.8m. The main bridge part of the project is assembled in the factory as a whole, slid onto the ship as a whole, shipped to the bridge site as a whole, and installed by floating method. The construction is difficult and challenging. It is reported that the project is planned to be completed in 2022. After completion, it will be the largest steel arch bridge in Hong Kong, which will become another landmark large-scale sea crossing bridge in Hong Kong after Tsing Ma Bridge and Stonecutters Island Bridge.



Ronsco a large-scale stainless steel coil, sheet, plate stockist, 3000 tons regular stock from Tisco, Tsingshan, ESS, ZPSS, which provides stainless steel materials for the railing construction of Tseung Kwan O bridge in two bid sections, including more than 450 tons of high-quality 1.4436 stainless steel plates and stainless steel profiles. After receiving the cooperation notice of the project, the company immediately assigns the task to relevant employees and strictly controls the production, transportation and delivery. Affected by New Coronavirus epidemic, material production faces obstacles. Ronsco has taken measures to ensure the smooth construction progress of the bridge project, such as work overtime, external assistance and rush shipment,etc. The good performance of Ronsco in this business process has been highly praised by customers. In the future, Ronsco will not forget the original intention, continue to take "providing customers with unique value" as purpose to enhance our service ability and create greater value for the society!


Start your project today

We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept
Decline